Some of our projects

Bonatti SPA

Pre-Commissioning Services of 30″ KRT-2 Pipeline (92.275 KM) Project Gallery

Read more
  • Aramco, Berry Gas Plant Saudi Arabia

    Operational Chemical Cleaning of D Frame Boiler
    January, 2014

  • Samsung Wasit Gas Project - Utility Plant, Khursaniyah, Saudi Arabia

    Chemical Cleaning of Four (4) HRSG’s (Macchi).
    August, 2014

  • Sepco III Utility Plant, Saudi Arabia

    Chemical Cleaning the total of Three (3) HRSG’s
    May, 2014

  • Samsung Wasit Gas Project - Utility Plant, Khursaniyah, Saudi Arabia

    Chemical Cleaning of Three (3) High Pressure Boilers (Macchi).
    September, 2014

  • Sepco III Utility Plant, Saudi Arabia

    Chemical Cleaning of 3 Feed Water Storage Tanks.
    May, 2014

  • Samsung Wasit Gas Project - Utility Plant, Khursaniyah, Saudi Arabia

    Chemical Cleaning of Condensate / Feedwater System.
    September, 2014

  • Sepco III Utility Plant, Saudi Arabia

    Chemical Cleaning of Sixteen Lube Oil and Gas Fin Fan Cooler System, and Air Drying to Negative 10ºC Dew Point Using GSP Desiccant Air Drying Units.
    May, 2014

  • Sabic, Sadaf

    Neutralization of Chlorine Storage Tank Using Sodium Carbonate Chemical Formulation.
    December, 2014

  • Manweir / Qatar Chemical Company Limited

    External Foam Cleaning and Internal Chemical Cleaning of Fin Fan Coolers on Call Off Basis for a period of Three Years.
    Mar-15

  • Samsung, Shaybah Gas Plant Precommissioning, Shaybah, Saudi Arabia

    Water milling of process piping.
    Jun, 2015

  • Samsung, Shaybah Gas Plant Precommissioning, Shaybah, Saudi Arabia

    Alkaline Degreasing of Amine Systems Using GSP High Volume Centrifugal Circulation Pumps (Trains 1 and 2 – Two Separate Systems).
    Sep, 2015

  • Samsung, Shaybah Gas Plant Precommissioning, Shaybah, Saudi Arabia

    Disinfection of Potable Water System Throughout Entire Large Gas Plant Incorporating Three (3) Plant Facility Layout Using Sodium Hypochlorite.

    Oct, 2015

  • SK Engineering, Wasit Gas Plant, Khursaniyah, Saudi Arabia

    Continuous High-Volume Targeted Steam Blowing Services for HP and LP Systems on Four (4) Gas Trains plus Utility Delivery Header System. Steam Blowing Rates at 100 to 200 Tons Per Hour.
    Jan, 2016

  • SK Engineering, Wasit Gas Plant, Khursaniyah, Saudi Arabia

    Chemical Cleaning of Four (4) Gas Trains, Each Gas Train Composed of the Following Systems: AGR Systems, Propane Refrigeration Units, TEG Systems, Lube Oil Micron Filtration to NAS 6 Specification, 20 Systems, Sulfur Recovery Units (SRU) at Gas Inlet Area, and MEG (Mono-Ethylene Glycol) Units at Gas Inlet Area.
    Feb, 2016

  • SK Engineering, Wasit Gas Plant, Khursaniyah, Saudi Arabia

    High Pressure Water Hydro-Milling Services with Chemical Preservative on Condensate Systems, AGR System Piping Circuits, Propane Refrigeration Piping Circuits, TEG System Piping Circuits and High and Low Pressure Steam Headers and Piping.
    Mar, 2016

  • Samsung, Precommissioning of IPP at Hawiyah, Abqaiq and Rastanura- Saudi Arabia

    Steam blowing services at 3 different locations of Saudi Aramco IPP.
    Jun, 2016

  • Samsung, Precommissioning of IPP at Hawiyah, Abqaiq & Rastanura- Saudi Arabia

    Chemical cleaning of HRSG (three nos.) each at 3 different locations of Saudi Aramco IPP.
    May, 2016

  • Samsung, Precommissioning of IPP at Hawiyah, Abqaiq & Rastanura- Saudi Arabia

    Air blowing services at 3 different locations of Saudi Aramco IPP.
    May, 2016

  • Samsung, Precommissioning of IPP at Hawiyah, Abqaiq and Rastanura- Saudi Arabia

    High pressure nitrogen leak test at 3 different locations of Saudi Aramco IPP.
    Jun, 2016

  • NCC, Al Qassim PP Project, KSA

    Water flushing, chemical cleaning of 12 nos. HRSG including neutralization of waste water/ effluent disposal and steam blowing of 3 blocks.
    May, 2017

  • Al Toukhi Company for Industry, Trading & Contracting

    Chemical cleaning and steam blowing for 4 no. of heat recovery steam generators and thermal cycle.
    Feb, 2018

  • HYUNDAI / SAUDI ARAMCO

    EDRF Chemical Cleaning Package-1 and Hot Akaline degreasing Package-3 at Uthmaniya Gas Plant expansion.
    April 2019

  • JGC - JIZAN REFINERY, KSA

    Terminal Project Pkg # 12 Steam Blowing at Jizan Refinery
    Nov 2019

  • RELAINCE INDUSTRIES LTD / INDIA

    Chemical Steam Blowing off IP-HP Lines @Z-PCG, Jamnagar Plant, India
    Feb 2020

  • SK ENGINEERING / SAUDI ARAMCO

    Chemical Cleaning by Soda Boilout of Two Loops-Jazan Refinery Terminal Project EPC-9
    Oct 2020

  • TECHNICAS REUNIDAS / SAUDI ARAMCO

    Hydro-milling (Aqualizing) Service of the Ras Tanura Refinery Clean Fuel Project
    June 2021

  • SEPCO 3 / BAHRAIN

    Chemical cleaning of 4 nos. of HRSG at Al Dur Phase -II Power Project
    Aug 2021

  • HYUNDAI / SAUDI ARAMCO

    Chemical Cleaning (Degreasing) and Lube Oil Flushing -Pre-commissioning Services of 18 nos. System
    Oct 2022

  • SAUDI ARAMCO / Shedgum Gas Plant

    Decontamination of BTX Carbon Beds @ Shedgum Gas Plant
    Oct 2022 – 2025 (Mid Term Contract)

  • SAIPEM / SAUDI ARAMCO

    Chemical Cleaning (Degreasing) and Lube Oil Flushing of Propane compressor and Sales Gas compressor – 5 nos System
    Jan 2023

  • SAUDI ARAMCO - Uthmaniya Gas Plant

    Columns / Exchangers Decontamination @ Uthmaniya Gas Plant
    Jan 2023 – 2025