Al Thouki Company
Chemical Cleaning and Steam Blowing for 4 no. of Heat…
Water Flushing, Chemical Cleaning of 12 Nos. HRSG (Heat Recovery…
Operational Chemical Cleaning of D Frame Boiler
January, 2014
Chemical Cleaning of Four (4) HRSG’s (Macchi).
August, 2014
Chemical Cleaning the total of Three (3) HRSG’s
May, 2014
Chemical Cleaning of Three (3) High Pressure Boilers (Macchi).
September, 2014
Chemical Cleaning of 3 Feed Water Storage Tanks.
May, 2014
Chemical Cleaning of Condensate / Feedwater System.
September, 2014
Chemical Cleaning of Sixteen Lube Oil and Gas Fin Fan Cooler System, and Air Drying to Negative 10ºC Dew Point Using GSP Desiccant Air Drying Units.
May, 2014
Neutralization of Chlorine Storage Tank Using Sodium Carbonate Chemical Formulation.
December, 2014
External Foam Cleaning and Internal Chemical Cleaning of Fin Fan Coolers on Call Off Basis for a period of Three Years.
Mar-15
Water milling of process piping.
Jun, 2015
Alkaline Degreasing of Amine Systems Using GSP High Volume Centrifugal Circulation Pumps (Trains 1 and 2 – Two Separate Systems).
Sep, 2015
Disinfection of Potable Water System Throughout Entire Large Gas Plant Incorporating Three (3) Plant Facility Layout Using Sodium Hypochlorite.
Oct, 2015
Continuous High-Volume Targeted Steam Blowing Services for HP and LP Systems on Four (4) Gas Trains plus Utility Delivery Header System. Steam Blowing Rates at 100 to 200 Tons Per Hour.
Jan, 2016
Chemical Cleaning of Four (4) Gas Trains, Each Gas Train Composed of the Following Systems: AGR Systems, Propane Refrigeration Units, TEG Systems, Lube Oil Micron Filtration to NAS 6 Specification, 20 Systems, Sulfur Recovery Units (SRU) at Gas Inlet Area, and MEG (Mono-Ethylene Glycol) Units at Gas Inlet Area.
Feb, 2016
High Pressure Water Hydro-Milling Services with Chemical Preservative on Condensate Systems, AGR System Piping Circuits, Propane Refrigeration Piping Circuits, TEG System Piping Circuits and High and Low Pressure Steam Headers and Piping.
Mar, 2016
Steam blowing services at 3 different locations of Saudi Aramco IPP.
Jun, 2016
Chemical cleaning of HRSG (three nos.) each at 3 different locations of Saudi Aramco IPP.
May, 2016
Air blowing services at 3 different locations of Saudi Aramco IPP.
May, 2016
High pressure nitrogen leak test at 3 different locations of Saudi Aramco IPP.
Jun, 2016
Water flushing, chemical cleaning of 12 nos. HRSG including neutralization of waste water/ effluent disposal and steam blowing of 3 blocks.
May, 2017
Chemical cleaning and steam blowing for 4 no. of heat recovery steam generators and thermal cycle.
Feb, 2018
EDRF Chemical Cleaning Package-1 and Hot Akaline degreasing Package-3 at Uthmaniya Gas Plant expansion.
April 2019
Terminal Project Pkg # 12 Steam Blowing at Jizan Refinery
Nov 2019
Chemical Steam Blowing off IP-HP Lines @Z-PCG, Jamnagar Plant, India
Feb 2020
Chemical Cleaning by Soda Boilout of Two Loops-Jazan Refinery Terminal Project EPC-9
Oct 2020
Hydro-milling (Aqualizing) Service of the Ras Tanura Refinery Clean Fuel Project
June 2021
Chemical cleaning of 4 nos. of HRSG at Al Dur Phase -II Power Project
Aug 2021
Chemical Cleaning (Degreasing) and Lube Oil Flushing -Pre-commissioning Services of 18 nos. System
Oct 2022
Decontamination of BTX Carbon Beds @ Shedgum Gas Plant
Oct 2022 – 2025 (Mid Term Contract)
Chemical Cleaning (Degreasing) and Lube Oil Flushing of Propane compressor and Sales Gas compressor – 5 nos System
Jan 2023
Columns / Exchangers Decontamination @ Uthmaniya Gas Plant
Jan 2023 – 2025